Chinese/English

Tianjin Zanpu Project


 
De-sail was responsible for the laying of the roof plate and walls, the inlet/outlet soundproof system, exhaust system, manufacture and installation of oil supply system, distribution cabinet in position, crane span structure layout, laying and connection of the main cable and control cable. 、
 








 

技术支持:天津沃思电子商务